Home
Contact Us
Site Map
terrestrial
Quick Contact
Home Services Overview
ELECTRICAL ENGINEERING

The source of power for telecom Infrastructure in recent times in Nigeria has been through power generating sets. All BTS, BSC and MSC are powered by generators all year round. However, the cost of maintaining these gen. Sets are enormous, it has led to operators introducing alternative source of power via external electrification system.

Under the alternative approach, power sub station (transformers) are installed within the BTS perimeters and connected to the national grid for electrification. The type of power capacity lines within specific BTS determines the connection options (whether high Tension-HT or Low Tension-LT, 33 or IL Lines).

Please find some of the installation materials we use for external electrification on clients specific requests.

  • - Substation/transformers (100KVA, 200KVA, 300KVA etc)
  • - Input and output LV panels
  • - Isolating switching gears
  • - Distribution panel
  • - Armored cables
  • - Gang isolators
  • - Aluminum conductors
  • - Concrete poles
  • - Cross channel iron
  • - D-fuse cut out
  • - Feeder pillar
  • - Lightning arrestors
  • - Pot insulation, etc

 

 
Website Development Companies Copyright © 2006 terrestial.
All rights reserved.
Home About Services Solutions Portfolio Contact
Support Services for the ICT Industry.
web design & development by: SpeedTouch